A Week of Change

This week has seen so much progress! Monday started with the slab pour. It was interesting to watch how the workers smoothed out the poured concrete as well as to see the different texture / seams on the outdoor patio.

It was sealed before Tuesday’s rain, which was stressful to see in person, but the slab was unharmed.

Wednesday was the start of framing, and after the first day we were getting walls!

On Thursday the project was looking like an entirely different beast entirely!

By the end of the week even some of the first floor joists were being put up! Seeing the first floor space in a real, physical way was incredibly interesting and satisfying.

Yes, this was taken under the forklift!
The Garage
The first floor flex space with bracing and joists in the background.
The first floor flex space entry, which will be a slider with glass on each side.
Looking through the first floor north bedroom window.
The first floor patio and backside of the bedrooms and bathroom. More windows to be cut!

The next week will again be a ton of change and we are so excited to see it evolve!